Document comparison: Must have
Place vessel-side and jacket-side design pressure and temperature on the same row for every bidder. Add working versus total volume, heating area, agitator speed and drive, nozzle schedule, lining inspection records, shipping versus installed weight, and the maintenance drawing for agitator removal. If a manufacturer pack omits one of those lines, mark the pack incomplete rather than averaging it with a complete pack.